Best modular house provider: Foundation Requirements – Flat-packed container house: The foundation requirements are simpler, enabling the use of strip foundations or pier foundations. In some cases, these houses can be placed directly on the ground without any foundation, eliminating the need for extensive leveling of the indoor ground. Light steel movable plank building: The foundation process is complicated, involving pouring concrete foundations measuring 300 mm x 300 mm. The house is connected to the foundation using expansion bolts, and the ground of the first floor needs to be leveled with concrete. After the house is moved, the foundation cannot be reused. Read additional info at container house China.
Lida detachable container house shows the advantage in installation process without any machines such as forklift and crane.The container house can be installed by hand and bolts.All the materials are separated in the factory and assembled in the local site. The size of the container house is customized. You can design as your requirement and don’t need to worry about the loading.Regarding the prefab detachable container house wall panel, it can be a flat shape sandwich panel or corrugated shape sandwich panel. Get quotes from Lida prefab house manufacturer!
Lida Group is the professional container house China and prefabricated house supplier since 1993. The main products of Lida Group contain modular house, prefabricated house, container house, temporary house, flat pack container house, large scale of labour camp, steel structure buildings, LGS Villa, and other integrated buildings, widely used in industry, traffic, city construction, commercial and other temporary accommodation.
Lida Construction Site Labor Camp building is made of light steel as structure and sandwich panels for wall and roof. Insulation of sandwich panel can be polystyrene, polyurethane, rock wool and fiber glass, which is determined by the demand and environment requirements. Lida Construction Site Labor Camp buildings can be assembled several times after one site construction finished, installed easily and cost effective.
The Lida Group Integrated Camp Prayer Room is an important part of the integrated camp and is used to pray for blessings. The prayer room can be part of a dormitory office building or a separate building. The building area is tailored to the number of camps to meet the needs of camp personnel. The litigation room of the Lida Group’s comprehensive camp uses a lightweight steel structure skeleton and uses composite panels for maintenance. According to the requirements of the camp and the local environment, the composite panels are available in EPS, fiberglass, rock wool and PU panels. After the completion of a project, the camp building can be demolished and reinstalled at another site, which is easy to install and recycles to reduce costs. Find more info at https://www.lidamodularhouse.com/.
Lida greenhouse is a kind of place that can change the environment of plant growth, create the best conditions for plant growth, and avoid the influence of the four seasons and bad climate. It uses daylighting covering materials as all or part of structural materials, and can be cultivated in winter or other seasons that are not suitable for the growth of open plants. Greenhouse production aims to regulate production period, promote growth and development, prevent and control diseases and insect pests, and improve quality and yield.
Lida Group Prefabricated House Supplier was established in 1993, as a professional steel buildings factory and exporter which is concerned with the design, production, installation and marketing of engineering construction. Lida Group container house China manufacturer has achieved ISO9001, ISO14001, ISO18001, EU CE certification (EN1090) and passed SGS, TUV and BV inspection. And we has obtained Second Class Qualification of Steel Structure Professional Construction Contracting and General Contracting Qualification of Construction Engineering.